Besides being used for soil foundation consolidation inhydropower and water resources projects, jet grouting is much morepopularly applied to prevent seepage for these projects. Comparedwith the traditional methods of foundation strengthening, constructionof jet grouted cutoff wall possesses different features andrequirements. For several years, with the great effort of engineers,many jet grouted cutoff walls have been constructed and a plenty ofexperience has been gained in construction of hydraulic structures invarious scales and under complicated geological conditions. In orderto ensure the quality of jet grouting works, this Standard isformulated in line with the characteristics of hydraulic structures.
作者簡介
暫缺《DL/T 5200-2004水電水利工程高壓噴射灌漿技術規(guī)范(英文版)》作者簡介
圖書目錄
Foreword 1 Scope 2 Normative References 3 Terms and Definitions 4 General Provisions 5 Structural Patterns of Jet Grouted Cutoff Wall 6 Grout 7 Equipment 8 Drilling 9 Grouting 10 Quality Inspection and Acceptance Appendix A (Informative Appendix) Construction Record Sheets Appendix B (Normative Appendix) Calculation of Permeability Coefficient of Enclosed Well